North OK Photo Gallery


Drilling the NOM 1H Horizontal
Drilling the NOM 1H Horizontal
Fracking at the well head
Fracking at the well head
Frack Truck prepare the NOM 1H wellsite
Frack Truck prepare the NOM 1H wellsite
Drilling the NOW 2H Horizontal
Drilling the NOW 2H Horizontal
Trucks containing 96,000 lbs of frack sand (13 trucks)
13 trucks of Frack sand were pumped downhole
NOS122 well head analysing free flow of oil to surface
NOS122 well head analysing free flow of oil to surface
Calyx's newest well-drilling rig drilling 4,000 horizontal Mississippi well in Payne Co.
Calyx's newest well-drilling rig drilling 4,000 horizontal Mississippi well in Payne Co.
NOS122 well head analysing free flow of oil to surface
Pump jack installed
Calyx's newest well-drilling rig drilling 4,000 horizontal Mississippi well in Payne Co.
Well head installation

Calyx-KAL Horizontal Drilling Rig in action drilling 4000' lateral Mississippi well
Calyx-KAL Horizontal Drilling Rig in action drilling 4000' lateral Mississippi well
Mississippi Horizontal production site, trucks loading oil, tank battery and disposal well
Mississippi Horizontal production site, trucks loading oil, tank battery and disposal well
New NOS227 Well awaiting completion
New NOS227 Well awaiting completion
No. 1 Well (Meyers ) tank battery
No. 1 Well (Meyers ) tank battery
NOJ26 (Jester) Tank battery, signage
NOJ26 (Jester) Tank battery, signage
NOJ26 (Jester) Tank battery, signage
NOJ26 (Jester) Tank battery, signage
NOJ26 Pump Jack
NOJ26 Pump Jack
NOJ26 Pump Jack
NOJ26 Pump Jack
NOJ26 Pump Jack
NOJ26 Pump Jack
NOJ26 Pump Jack
NOJ26 Pump Jack
Preparing workover rig to acidize NOJ26 well, North Oklahoma
Preparing workover rig to acidize NOJ27 well, North Oklahoma
Directors McIntosh and Holliday at No.1 well, North Oklahoma
Directors McIntosh and Holliday at No.1 well, North Oklahoma
Pumpjack in operation at No.1 well, North Oklahoma Project
Pumpjack in operation at No.1 well, North Oklahoma Project
Workover rig in preparation to acidize NOJ 26, North Oklahoma
Workover rig in preparation to acidize NOJ 26, North Oklahoma
Well head at No. 1 Well
Well head at No. 1 Well
Pumpjack at No. 1 Well
Pumpjack at No. 1 Well
Pumpjack at No. 1 Well
Pumpjack at No. 1 Well
Tank Battery at No. 1 Well
Tank Battery at No. 1 Well
Work over rig acidizing shale pay zone
Work over rig acidizing shale pay zone
Company President reviewing work at No. 2 well
Company President reviewing work at No. 2 well
Oil from test at No. 2 well
Oil from test at No. 2 well
Drilling equipment at No. 2 Well
Drilling equipment at No. 2 Well

    
Back to Top
Standard & Poor's - American Petro-Hunter Inc.


Click on the images below for a larger version >


NORTH OKLAHOMA OIL PROJECT
North Oklahoma - Location

NORTH OKLAHOMA OIL PROJECT